Seal Beach
| From our shop | 3 miles, straight line |
|---|---|
| Homes we see | Old Town cottages, College Park homes, and Leisure World units. |

Floors, showers and backsplashes, set by our own crew across the coast.

Five cities within a short drive of Old Ranch Parkway.
| From our shop | 3 miles, straight line |
|---|---|
| Homes we see | Old Town cottages, College Park homes, and Leisure World units. |

| From our shop | 7 miles, straight line |
|---|---|
| Homes we see | We see bungalows, apartments, newer infill, and larger family homes across Long Beach. |

| From our shop | 2 miles, straight line |
|---|---|
| Homes we see | Older single-family neighborhoods sit alongside attached and multifamily homes. |

| From our shop | 6 miles, straight line |
|---|---|
| Homes we see | Planned postwar tract homes with later neighborhood additions and remodels. |

| From our shop | 9 miles, straight line |
|---|---|
| Homes we see | Established neighborhoods include tract homes, apartments, and newer infill residences. |

| Room | Floor |
|---|---|
| Tile | Light veined large-format tile |
| Layout | Straight grid |
| Area | Ask us |
| Room | Shower |
|---|---|
| Tile | Gray linear wall tile and narrow floor tile |
| Layout | Straight and offset linear courses |
| Area | Ask us |
| Room | Kitchen |
|---|---|
| Tile | White hexagon backsplash tile |
| Layout | Hexagon mosaic |
| Area | Ask us |
| Room | Bathroom |
|---|---|
| Tile | Light veined wall tile and dark pebble-look mosaic |
| Layout | Large-format wall tile and irregular mosaic floor |
| Area | Ask us |
| Room | Floor |
|---|---|
| Tile | Light veined large-format floor tile |
| Layout | Straight grid |
| Area | Ask us |
| Room | Shower |
|---|---|
| Tile | Green rectangular wall tile and light pebble-look floor mosaic |
| Layout | Vertical stacked rectangles and pebble-look mosaic |
| Area | Ask us |
Typical days for each job. Your written estimate gives your dates.
These are typical medium-size working-day allowances, not promised dates. Curing, weekends and other waits may add elapsed time.
| Job | Stage | Working days |
|---|---|---|
| Kitchen backsplash | Prep and protect | 0.5 |
| Set tile | 1 | |
| Grout and caulk | 0.5 | |
| Seal after grout cures | 0.5 | |
| Bathroom floor | Remove old tile | 1 |
| Level and prep | 1 | |
| Set tile | 1 | |
| Grout | 1 | |
| Shower walls and pan | Demolition | 1 |
| Pan, curb and waterproofing | 1–2 | |
| Flood test | 1 | |
| Set tile | 2–3 | |
| Grout and seal | 1 | |
| Full bathroom | Demolition | 1–2 |
| Prep and waterproofing | 2 | |
| Flood test | 1 | |
| Set walls and floor | 3–4 | |
| Grout and seal | 1–2 | |
| Large open floor | Remove old flooring | 1–2 |
| Level and prep | 1–2 | |
| Set tile | 3–4 | |
| Grout | 1–2 |
The kitchen is typically usable from about day 2, before a later seal visit. A bathroom floor may be walked on about one more day after grouting; showering typically follows about three days after grouting, once cured. Light foot traffic on set floor areas may be possible after 24 hours. Confirm each return to use with the installer.
Sand: shorter path. Outline: longer path.
Scroll the days to see the full scale.
Working days only; curing and weekends add elapsed time.
Ask about these datesFrom the base to the joints.
Floors and backsplashes.
About residential tile installationTile for working spaces.
About commercial tile installationThe finish and waterproofing.
About bathroom and shower tileA sound base first.
About tile removal and floor prepThe Timeline gives typical days. Your estimate sets the sequence and cure restrictions.
Only if the existing surface is sound, compatible and at the right height.
Either can be discussed. Confirm the tile and quantity before ordering.
Grout choice, cleaning and movement details matter. Salt air alone is not a diagnosis.
Removal and debris handling can be included in the written scope.
Ask for preparation, installation and exclusions to be listed separately.