Tile work, from Seal Beach to LA.

Floors, showers and backsplashes, set by our own crew across the coast.

Veined salon floor tiles and their grout lines beside a row of chairs

Where we work

Five cities within a short drive of Old Ranch Parkway.

3020 Old Ranch Pkwy, Seal Beach, CA 90740

Long Beach

From our shop7 miles, straight line
Homes we seeWe see bungalows, apartments, newer infill, and larger family homes across Long Beach.
Glass shower enclosure with gray linear tile and a bench
Tile installation in Long Beach

Los Alamitos

From our shop2 miles, straight line
Homes we seeOlder single-family neighborhoods sit alongside attached and multifamily homes.
White hexagon tile backsplash behind a kitchen range
Tile installation in Los Alamitos

Lakewood

From our shop6 miles, straight line
Homes we seePlanned postwar tract homes with later neighborhood additions and remodels.
Bathroom with veined tile walls, dark mosaic floor and freestanding tub
Tile installation in Lakewood

Huntington Beach

From our shop9 miles, straight line
Homes we seeEstablished neighborhoods include tract homes, apartments, and newer infill residences.
Light large-format tile floor through a kitchen with an island
Tile installation in Huntington Beach

How long will the room be out of use?

Typical days for each job. Your written estimate gives your dates.

These are typical medium-size working-day allowances, not promised dates. Curing, weekends and other waits may add elapsed time.

Typical medium-size stages and working days
JobStageWorking days
Kitchen backsplashPrep and protect0.5
Set tile1
Grout and caulk0.5
Seal after grout cures0.5
Bathroom floorRemove old tile1
Level and prep1
Set tile1
Grout1
Shower walls and panDemolition1
Pan, curb and waterproofing1–2
Flood test1
Set tile2–3
Grout and seal1
Full bathroomDemolition1–2
Prep and waterproofing2
Flood test1
Set walls and floor3–4
Grout and seal1–2
Large open floorRemove old flooring1–2
Level and prep1–2
Set tile3–4
Grout1–2

The kitchen is typically usable from about day 2, before a later seal visit. A bathroom floor may be walked on about one more day after grouting; showering typically follows about three days after grouting, once cured. Light foot traffic on set floor areas may be possible after 24 hours. Confirm each return to use with the installer.

What we install

From the base to the joints.

Good questions

How long does a shower take?

The Timeline gives typical days. Your estimate sets the sequence and cure restrictions.

Can you tile over the old floor?

Only if the existing surface is sound, compatible and at the right height.

Do I buy the tile or do you?

Either can be discussed. Confirm the tile and quantity before ordering.

What does salt air do to grout?

Grout choice, cleaning and movement details matter. Salt air alone is not a diagnosis.

Do you remove old tile and haul it away?

Removal and debris handling can be included in the written scope.

Do you give written estimates?

Ask for preparation, installation and exclusions to be listed separately.

Ask for an estimate

(213) 325-3935

[email protected]

3020 Old Ranch Pkwy, Seal Beach, CA 90740

Hours: [placeholder]

Get directions
Which room?
Enter a US phone number.
Room, approximate size, tile type

Ask for an estimate

Which room?
Enter a US phone number.
Room, approximate size, tile type